Manual J, Manual S, and Manual D: What’s The Difference?
Date Published: January 12, 2023
In this day and age, energy efficiency protocol is an integral part of the construction process. When it comes to newly built homes, everything from the building envelope to the HVAC must adhere to regulations established by the IECC.
As an energy services company we are well-versed in all the aspects related to energy code. However, in this article, we will put the microscope on HVAC systems in new builds, and what it takes to meet code compliance.
If you are involved in the building process, you have likely heard the terms Manual J, Manual S, Manual D or all together Manual JSD. These are different standards, put in place by the Air Conditioning Contractors of America (ACCA) that are used to calculate IECC-compliant HVAC design.
Each manual deals with a different aspect of the system, and they work together to ensure that the system is properly sized and installed to meet the needs of the building. Let’s take a closer look!

Image sourced from: https://utahenergycode.com
What is Manual J?
When determining proper HVAC design, Manual J is the first step. This step uses a series of calculations to determine a building’s heating and cooling load.
FYI: The heating load is the amount of heat energy that would need to be added to a space to maintain the temperature in an acceptable range. The cooling load is the amount of heat energy that would need to be removed from a space (cooling) to maintain the temperature in an acceptable range.
Manual J is able to make an accurate assessment by analyzing certain factors such as:
- Size and orientation of the building
- Type and number of windows and doors
- Insulation levels
- Lights and appliances
- Climate zone
- Number of occupants
What is Manual S?
So now that you have made all the proper load calculations with Manual J, what’s next? It’s time to move on to Manual S. This standard is utilized to determine and select the proper HVAC equipment needed in a given residence.
Manual S considers factors such as the size, efficiency, and capacity of the equipment. The equipment must sufficiently handle the heating/cooling load calculated by Manual J.
What is Manual D?
If the HVAC project requires a duct system, then Manual D will be a necessary step. This is an integral part of the process when determining ductwork design.
Manual D utilizes the findings yielded from Manual J (heating/cooling load) and S (system material). It also analyzes other factors, including the static pressure in every room, the friction rate, the location of the air handler, and the distance between each register.
Why Are Manual J, S, and D Reports So Important?
So, why is it so important to make all these evaluations? For starters, it might actually be required in your region. The majority of the country has adopted the IECC building code, which (as stated above) does require Manual J/S or Manual J/S/D evaluations and reports for new residential building projects. So be sure to meet all of your code requirements for your building permits!
But let’s set all that “code talk” aside now. Because, when it comes down to it, the most important thing is getting a quality product and saving money while doing so. No matter the size of your project, you (or your client) want to get the most bang for your buck.
By hiring a professional to make these crucial HVAC assessments, you will be able to choose a system that is customized exactly to the living space. This will ensure cost effectiveness, energy efficiency and overall in-home comfort.
Scott Mechanical Design
At Scott Mechanical Design, we have a team of energy code specialists certified to meet all of your mechanical system design needs. We offer two services – a Manual J and S Only Report and a Manual J, S, and D Report. You will need the Manual D included if duct work is involved in your project.
We offer these services nationwide and they are completely online! Our streamlined interface makes it easy for you to schedule a service and submit all the necessary building documents, so we can get to work.
We pride ourselves in generating, high-quality, IECC-compliant reports in a timely manner. If you are in need of a Manual J/S Report or Manual J/S/D Report, don’t hesitate to contact Scott Home Services for more information or book your service today!
Related Articles
If you enjoyed this article, you may be interested in some of our others.